Operational test

1. External examination of the mask, and lung machine. Remove the mask from the bag, verify its regularity and the correct connection to the lung machine.

2. Check the tightness of the unit and exhalation valve in the discharge. Put on the head of the mask and with the valve closed container to take a breath. If then there is a great resistance, and it is impossible to make the further breath for 2-3 seconds, then it shall be considered that the unit and the valve exhalation sealed.

3. Check of the serviceability of the lung machine and exhalation valve in the work. Without taking off the mask from the face, open shut-off valve cylinder and make 2-3 deep inhalation and exhalation. Resistance when you inhale and exhale feel should not. Hold your breath and listen, there are no air leaks or any noise.

4. Check of the serviceability of signal devices. Close the shut-off valve cylinder. Slowly press the additional air supply lung machine, closely follow the arrow of the gauge. Signalling device must engage at an air pressure of 4.5-5-5,5 MPa.

5. Check the air pressure in the cylinder. Open the valve on the cylinder, look at the pressure gauge and remember pressure. The air pressure in the cylinder air-317 should be not less than 29 MPa, and for air-217 not less than 19 MPa.

After the operational testing, not taking off the mask from the face, газодымозащитник reports to the commander of the according to the following form: "Ivanov to work is ready, the pressure ..."

Check № 1

1. External inspection of the unit. Check the purity of the machine, fuser units, the absence of mechanical damage, the regularity of the mask. Connect the mask with lung machine and perform the fitting belts.

2. Check the tightness of the unit and exhalation valve in the discharge. Put on the head of the mask and with the valve closed container to take a breath. If then there is a great resistance, and it is impossible to make the further breath for 2-3 seconds, then it shall be considered that the unit and the valve exhalation sealed.

3. Check of the serviceability of the lung machine and exhalation valve in the work. Without taking off the mask from the face, open shut-off valve cylinder and make 2-3 deep inhalation and exhalation. Resistance when you inhale and exhale feel should not. Hold your breath and listen, there are no air leaks or any noise. Take off the mask from the face.

4. Check the air pressure in the cylinder. Open the shut-off valve cylinder and look at the gauge. Remember pressure.

5. Check the tightness of high-pressure systems. Close the shut-off valve cylinder. Look at the indicator of the pressure gauge and on the clock observed one minute. Pressure drop in the system of the machine for one minute should not exceed 1 MPa.

6. Check of the serviceability of signal devices. Slowly pressing on the lung machine monitor closely the arrow of the gauge. Signalling device must engage at an air pressure of 4.5-5-5,5 MPa.

Check № 2

1. Cleaning the unit. Is executed after each work in the office for the removal of its units of pollution and for disinfection (washing) of the mask. Special attention should be paid to thorough drying of the respiratory valve masks. Slow drying can lead to stick together petals valve and substantial resistance to breathe. After cleaning and disinfection of the master database ГДЗС is charging cylinder unit with compressed air. After charging cylinder is connected with reduction gear and fixed clamp to the chassis.

2. Check the appearance of the machine. Check the absence of mechanical damage on the nodes and the tank of the unit, reliability, and density of all connections, integrity and correctness of the connection of the shoulder and lap belts.

3. Check of the serviceability and control gear. Connect the control pressure gauge connector. Open the shut-off valve cylinder and look at controlling the pressure gauge. The pressure created by the gearbox must be set to 0.65 +0.75 MPa. In addition, there should be no hesitancy of the arrow pressure gauge, which indicates the loose прилегании valve gearbox to the saddle.

4. Check of the serviceability and regulation of the safety valve gearbox. Any tool click on support through the hole in the regulatory nut gear. When the air pressure in the chamber gear will increase up to pressure of the safety valve gearbox. When the air outlet through the safety valve look at controlling pressure gauge, Pressure of the safety valve gearbox must be 1,2-5-1,3 MPa. Disable the check the pressure gauge from the connector.

5. Test of the auto перекрывателя capillary. For this it is necessary when you open the valve cylinder Unscrew for 2-3 turnover of external pressure gauge, signalling device. Hissing through air leakage should not be. Screw the pressure gauge in the former position. The arrow must stay on a mark of zero. If the inspection will be noticeable hissing or the arrow starts to move, then close the cylinder valve, releasing the air from the system and send the unit for repair at the base ГДЗС.

6. Check the tightness of the lung machine. Close the cylinder valve. Connect pulmonary machine реометр-pressure gauge with the cork from the hole. Check of the serviceability of the lung machine is held under negative pressure and the let-down in its cavity:

- at excess pressure. For this it is necessary to create in the cavity of the lung machine gauge pressure 800 PA (80 mm Hg). Look at the clock. Pressure drop must not exceed 50 PA (5 mm Hg.) for 1 minute.

- at discharge. To do this, you must create a discharge in the cavity of the lung machine 800 PA (80 mm Hg). The pressure drop of the discharge shall not exceed 50 PA (5 mm Hg.) for 1 min.

7. Check of the serviceability of the lung machine. Without disconnecting the pulmonary vending machine from реометр-gauge, open the valve cylinder. Slowly create a vacuum in the body of the lung machine, see the реометр-gauge pressure at which starts to work pulmonary machine. Response of the lung machine will be sensitive to hiss of air coming into its cavity. Pressure discharge shall not exceed 300 kPa (30 mm Hg).

For pulmonary machine III-rd type the following checks:

- excessive pressure in the zone of breath,

Turn on the device excess pressure when you open the valve cylinder. The fitting of the lung machine insert the rubber plug from the outlet. Disconnect the реометр-gauge from the atmosphere (spin the wheel of the instrument). On a scale реометр-pressure gauge to determine the pressure, which should be within the range of 320-350 PA (32-35 mm Hg)

- serviceability switch excess pressure.

Remove the switch rod excessive pressure from the Cabinet of lung machine. To connect the реометр-pressure gauge to the atmosphere (loosen the wheel of the instrument). After the installation of fluid at the "0-0", disconnect the system is checked from the atmosphere (spin the wheel of the реометр-gauge). If the pressure in the cavity of the lung machine is not growing, switch excess pressure is considered to be good.

8. Check the tightness of high-pressure systems. Close the shut-off valve cylinder. Look at the indicator of the pressure gauge and on the clock observed one minute. Pressure drop per minute should not exceed 1 MPa.

9. Check the air pressure in the cylinder. Open the shut-off valve cylinder and look at the gauge. The air pressure in the tank should be not less than 29 MPa for air-317 and not less than 19 MPa for air-217.

10. Check the signal devices. Close the cylinder valve. Slowly remove air from the system unit, press the additional air supply lung machine, closely follow the arrow of the gauge. Notice, at any pressure turns on the beep. Sound to start working at a pressure of air 5-6 MPa.

English

Официальный дистрибьютор Draeger Safety AG & Co. KgaA, Германия

ООО "Технология для жизни"

Адрес: Офис 406-408, ул.Университетская 80-В, г.Донецк, 83114, Украина

http://www.tfl.com.ua/

тел/факс: 8 (062) 381-80-74

тел: 8 (062) 345-75-80

           8 (062) 345-75-70

email: office@tfl.com.ua

Киевский филиал: Офис 403, ул.Щорса 31, Киев 01133

email: tfl.kiev@gmail.com

Производитель пожарных рукавов

ЧП "Энергопром" 

Адрес: ул.Рудакова 56, г.Луганск, 91020, Украина

http://1energo.prom.ua/

факс: 8 (0642) 33-04-48

тел: 8 (0642) 33-04-48

           8 (0642) 55-50-18

           8 (0642) 33-04-49

           8 (0642) 92-00-10

Контактное лицо: Вадим Смык

тел: 8 (0642) 33-04-48

график работы: с 8-00 до 15-30 ПН-ПТ

 

Пожарное оборудование и инженерная сантехника

ООО "Комплект 01"

Адрес: 105082, г.Москва, ул.Большая Почтовая, д.36, стр.10. - Главный офис и Малый склад

г.Москва, ул.Матросская тишина, д.1а. - Склад оптовых отгрузок 

http://www.komplekt01.ru/

тел: 8 (495) 380-32-79 (многоканальный телефон/факс);

        8 (495) 380-31-08 (многоканальный телефон/факс);

        8 (495) 506-15-08

график работы: с 8-00 до 18-00 ПН-ЧТ

                              с 8-00 до 17-00 ПТ  

 

 

Поставка пожарного оборудования и аварийно-спасательного снаряже

Компания "Пожарный профи"

Адрес: 197342, г.Санкт-Петербург, наб.Черной речки, д.41 

http://www.pozh-profi.ru/

тел: 8 (812) 331-81-95

           8 (812) 496-22-19

           8 (812) 643-26-31

график работы: с 9-30 до 17-00 ПН-ЧТ

email: info@poxh-profi.ru

СТО огнетушителей:

г.Санкт-Петербург, ул.Профессора Попова, д.38

тел/факс: 8 (812) 334-14-75

тел: 8-921-98839-24

          8-988-69-24

 email: Koroleva.sop@inboxi.ru